How a paper fill is priced
Every filled decision on a published record lists the exact figures the engine stored when it carried out that decision as a simulated fill. This page walks each figure in order and says what it is and what it is not, so the numbers on a record come with a key.
One published fill is used as a worked example, dated and labelled simulated. Each figure stands on its own, and no two are added together.
What each figure is, and what it is not
Amount in
What went into the fill. For a buy, the quote asset the engine spent, in SOL or USDC. For a sell, the token it sold.
It is the exact amount the stored fill recorded going in. It is not a price, and it is not a suggestion to spend that much.
Amount out
What came out of the fill, after the venue fee. For a buy, the token received. For a sell, the quote asset received.
It is the exact amount the stored fill recorded coming out. It is not a result, and it is not a valuation.
Slippage
The unsigned difference between the price the engine read when deciding and the price it read again when filling, in basis points. It is market drift between the two reads.
It is a recorded measurement of the two reads. It is not a fee, it is not a result, and it is separate from price impact.
Price impact
How much the fill's own size moved the price, in basis points. Where a route exists, it comes from the router's quote for exactly that size. Otherwise it is a constant product estimate on the reported depth.
It is the recorded estimate from the model. It is not a cost added on top of the amounts, and it says nothing about what happened afterwards. Zero basis points with a model that says not modelled means the impact was not modelled, not that there was none.
Fee
The venue fee, in the asset that went in. On a routed fill where the router reports no fee, the engine records zero.
It is what the venue took, as the fill recorded it. It is not subtracted twice from the amounts.
Latency
How long passed between the engine's quote and the fill, in milliseconds.
It is a recorded time measurement. It is not a claim about speed, and it is not a measure of quality.
Impact model
The sentence the engine used to name how it priced the impact. The snapshot schema caps it at 40 characters, and a longer sentence, or one with punctuation the schema does not allow, is shown as unknown rather than cut.
It is the sentence the fill stored, word for word. It does not endorse the model, and it says nothing about how the fill turned out.
Router path
Not recorded on the fill.
The fill record does not hold which route the order took. Saying so beats a route borrowed from a quote sampled at another moment, which is a different observation of a different moment.
A worked example
No published fill with pricing details was found, so the example below is schematic. Each figure appears with no number filled in, never a made-up one.
- Amount in
- Unknown, not recorded
- Amount out
- Unknown, not recorded
- Slippage
- Unknown, not recorded
- Price impact
- Unknown, not recorded
- Fee
- Unknown, not recorded
- Latency
- Unknown, not recorded
- Impact model
- Unknown, not recorded
- Router path
- Not recorded on the fill
A schematic example shows the same figures a real fill would carry. It is not a published fill.
Standing costs
Recorded fills include simulated venue fees, slippage and price impact. Fees below are informational and are not subtracted twice. Unreported fees are unknown. No model, hosting or network costs are estimated.
Paper fills are simulated and do not establish investment performance. No blockchain proof is claimed. None of it is advice.